Rehabilitation of the existing gravel Erathna - Adavikanda road: |
| |
• |
Melted and surfaced the road with tar for a distance of 1.5 kilometres from Weerakade junction to Kekunahinna. |
| |
• |
0.75 kilometre of road was laid with ABC and Premix |
| • |
Rehabilitation of the Kuruwita - Erathna road for a distance of 5 kilometres from Kuruwita to Sudagala with a side wall was constructed at a culvert near Marukanda. |
| • |
Construction of a building for a local school at Erathna Maha Vidyalaya |
| • |
Rehabilitation of the men's ward at the Erathna rural hospital |
| • |
Rehabilitation of the Police Station at Kuruwita |
| • |
Five hundred steps were constructed at Warnagala for the development of the footpath at the nearby popular pilgrimage at Sri Pada |
| • |
Construction of a place of worship at Sri Pada |
| • |
Construction of a Buddha statue with platform for worshipping at Sri Pada |
| • |
Construction of hand rails and guard rails along the pilgrims' path for a length of 100 metres at Sri Pada |
| • |
Construction of foot bridges for the pilgrims at Sri Pada |
| • |
Financial donations to needy patients for heart operations. |
| • |
Construction of a road by the project proponents for access to the forebay tank, which provides access to Halgastenna. Previous access was via a steep footpath where villagers met with difficulties, especially during emergencies |